Safeguarding Synergy - C-TEC
extinguisher panel installed at Manchester's Tier II Data Centre
C-TEC’s new EP203 automatic extinguisher panel
has been installed at Manchester’s newest Tier II data centre,
Synergy House, operated by UK Grid.
One of the country’s fastest growing internet providers, UK Grid’s
high-technology facility is located at Manchester’s Science Park
and has the capacity for up to 300 racks of IT equipment.
Operating in the main communications/server room, C-TEC’s EP203
panel plays a vital role in safeguarding the company’s impressive
700sq ft data store.
Fully compliant with EN12094 part 1, the EP203 functions as a standard
three-zone fire panel with extra circuitry for controlling the release
of fire suppressing gas into areas where fires need to be extinguished
quickly with minimal damage to equipment. The panel is just one of
many safeguards in the facility – other protective equipment
includes back-up generators should a mains power failure occur, security
systems and a high-tech air-conditioning system designed for such facilities.
Says John Sweeney of Manchester Electrical Contractors, the company
which specified the system: "Automatic extinguisher panels should
be fitted as standard in rooms housing expensive, dangerous or irreplaceable
items of equipment. In today’s IT based society, companies are
keen to ensure that the technology they use is sufficiently protected
or face thousands of pounds of equipment being damaged and hours of
downtime".
With the growing emphasis on safeguarding property as well as people,
demand for automatic fire suppression systems is booming. Comments
John: “As a specialist installation company, we have noted a
significant increase in projects specifying the installation of automatic
extinguisher panels. We were particularly impressed with the C-TEC
panel as the large graphical display makes it easy-to-install and operate.”
Manchester Science Park is one of the city’s most prestigious
business locations for companies in high-technology sectors and is
internationally recognized as a groundbreaking centre of excellence.
With three sites accommodating over 100 companies, its reputation as
one of the most successful and fastest growing locations of its kind
is underpinned by its proven ability to provide the environment, facilities
and support to maximise innovation and commercial success.
UK Grid
moved onto the Science Park in 2006 and now provides a reliable and
cost-effective range of connectivity, network and bandwidth services
to companies all over the UK.
|